| Lesson-Perspective Five-Western Railway |
| TIME: Allow 40min Aim:
Materials: Construct margin and title box then:
a) Construct the same light lines as in stage a, b, c, d, of the previous lesson until we get the lines shown above.
b) This time we firm in the 'diagonals' which become railway line 'sleepers'. Notice here we use a more simplified method of construction.
c) Keep adding sleepers.
d) After the student has completed the
drawing to the stage above ask:
e) Add the extra light lines on the ground (two horizontal and three to the CVP). We are going to build a station about 30mm (1,1/4") from track 60mm wide.
f) Add the vertical lines 50mm (2") high and join to CVP
g) Firm in the lines as shown and
ask:
h) Add the telegraph lines and poles and have the student determine their height and distance apart. Clean up and print in the title as
shown.
|